b'PWS ID PWS Name PWS Type PrimaryPopulation Source ServedID3380031 NUNHEMS Non-Transient non-community system Ground water 230ID3380038 PARTNERS PRODUCE Non-Transient non-community system Ground water 50ID3380015 BLACK CANYON MOTEL C/O STINKERTransient non-community system Ground water 10045ID3380032 BLACK CANYON STINKER Transient non-community system Ground water 100ID3380033 DUNDAS WORKS Transient non-community system Ground water 25ID3380036 HAMMER STORES Transient non-community system Ground water 500ID3380025 HENGGELER PACKING COMPANY INC Transient non-community system Ground water 50ID3380010 SAND HOLLOW COUNTRY STORESTransient non-community system Ground water 100AND CAFEID3380011 SCOTCH PINES GOLF COURSE Transient non-community system Ground water 25ID3380034 SEMINIS VEGETABLE SEEDS Transient non-community system Ground water 52ID3380012 SNAKE RIVER VIEW REST AREA IDT Transient non-community system Ground water 1,500FIGURE 4. EPA Regulated Water Systems 8Wastewater/Sewer City of Payette The Payette wastewater treatment plant is an activated sludge plant. It is designed to handle a maximum ow of 2.88 m.g.d. Average daily ow is 1.5 m.g.d. serving a population of 7,454. The euent from the clariers is disinfected with CL2 through a chlorine loop.9 City of Fruitland The City of Fruitland has operated two aerated lagoon treatment plants for over twenty years. One is approximately twelve acres in size and is located adjacent to the Snake River. The other is a ve acre plant located adjacent to the Payette River. Both plants receive a combination of domestic sanitary and industrial waste water for secondary treatment. Each plant receives the majority of organic loads from industrial sources. The total operating volumes are approximately 20 million gallons at Snake River and 8 million gallons at Payette River. With average ows of .2 to .3 million gallons per day, each facility has sucient hydraulic capacity to eectively treat Fruitlands domestic, commercial and industrial wastewater.5 City of New Plymouth Collection System: 47,000 linear feet (approx. 9 miles)Lift Stations: 1 in Jiano Industrial ParkTreatment Facility: Facultative lagoons, 37 acres of surface areaRated Design Flow: 600,000 gal/day Actual Flows: 130,000 gal/day (approx.) annual average daily ow; 300,000 gal/day (approx.) maximum daily owCurrent Households: 565 per 2010 censusRemaining Capacity: 565 (approx.) households (equivalent dwelling units)7Irrigation Black Canyon Irrigation Dist (95,187 acres)Noble Ditch CO (15,264 acres) Lake Reservoir Co (85,752 acres)Little Willow Irrigation Dist (6,110 acres) Lower Payette Ditch Co (21,556 acres)Letha Irrigation & Water Co Inc (5,993 acres) Farmers Cooperative Irrigation Co Ltd (20,228 acres)Stewart Ditch Co (2,438 acres)Acres irrigated: 59,15010PAYETTE County 563'